| Customization: | Available |
|---|---|
| Accuracy: | Seismic Survey Instrument |
| Horizontal Line: | Seismic Refraction Instrument |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
WZG-24C/48C: Mapping City Undergrounds with Digital Precision
See Beneath Streets Before Digging
Urban construction faces hidden risks: unmapped utilities, forgotten tunnels, and unstable ground. The WZG-24C/48C serves as your digital underground explorer, creating 3D utility maps without disruptive digging. For city planners and construction teams, it's like having X-ray vision for urban landscapes - preventing costly accidents and keeping projects on schedule.
Why Cities Choose This Solution
Risk Prevention
Utility Conflict Detection: Identify clashes between new and existing infrastructure.
Void Mapping: Locate undocumented tunnels and underground cavities.
Efficiency Optimization
Project Acceleration: Reduce planning time by 60% with accurate underground data.
Cost Reduction: Avoid accidental utility strikes that average $50,000 per incident.
Historical Preservation
Archaeological Protection: Detect historical features before construction damage.
Environmental Safety: Prevent contamination from hitting buried storage tanks.
Urban Mapping Specifications
| Capability | Urban Application |
|---|---|
| 30m Depth Resolution | Covers most urban infrastructure depth |
| 5cm Positioning Accuracy | Precise utility mapping |
| Real-Time Data Processing | Immediate results during surveys |
| GIS Integration | Direct compatibility with city planning systems |
| Traffic Noise Filtering | Works in busy urban environments |
| Multi-Language Support | Suitable for international projects |
| Compact Deployment | Operates in tight urban spaces |
Urban Success Stories
Tokyo Metro Expansion: Avoided 12 utility conflicts in downtown project.
London Crossrail: Prevented damage to historical Roman remains.
New York Infrastructure: Located 45 unmapped utility lines in Manhattan.
Why Municipalities Invest
7:1 ROI through accident prevention and time savings.
Public Safety: Prevents gas line strikes and electrical accidents.
Regulatory Compliance: Meets all urban excavation requirements.





