| Customization: | Available |
|---|---|
| Accuracy: | 1%F.S |
| Horizontal Line: | Pile Diameter Test |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
| GDZ-4s control case |
| caliper/inclinometer measuring probe |
| sediment/inclinometer measuring probe |
| automatic cabling winch |
| Caliper calibrator |

The well is 37 meters deep, with a designed aperture of 1200m and an average measured value of 1200mm. There is a small expansion at 22m-23m and a larger expansion at 26m-27m, with the maximum reaching 1478mm.
The depth of this measurement is 35.27 meters, and a point is measured every 5 meters (a point can be measured every 4/3/2/1 meters, depending on the actual situation and needs). The composite angle is the top angle of the probe tube. From the reading, it does not exceed 0.05 degrees. The smaller the composite angle, the more vertical the hole is. The eccentricity is accumulated step by step, and each data is accumulated on the basis of the previous data. The verticality is within 0.05%. The smaller the verticality, the more vertical the hole is (generally required to be within 1%). After the measurement, the composite angle, eccentricity and verticality of the last set of data are taken as the standard.
The depth of this measurement is 35.27 meters, and a point is measured every 5 meters (a point can be measured every 4/3/2/1 meters, depending on the actual situation and needs). The composite angle is the top angle of the probe tube. From the reading, it does not exceed 0.05 degrees. The smaller the composite angle, the more vertical the hole is. The eccentricity is accumulated step by step, and each data is accumulated on the basis of the previous data. The verticality is within 0.05%. The smaller the verticality, the more vertical the hole is (generally required to be within 1%). After the measurement, the composite angle, eccentricity and verticality of the last set of data are taken as the standard.