Customization: | Available |
---|---|
Accuracy: | <1mm |
Horizontal Line: | 1 |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1. Monitoring of overfilling of cast-in-place pile top concrete:
2. Widely used in industrial public construction, municipal, residential and other construction fields.
Determine whether the concrete has reached the specified position by the difference in motor speed in mud, slurry and concrete. Technical
1. Simple principle and wide range of application
2. High sensitivity, accurate and reliable results;
3. The equipment is light, strong and durable, and can adapt to harsh on-site use environments:
4. Intelligent and simple, highly automated, suitable for all workers to operate.
2. System Features
(1) Impedance + resistance double verification, high monitoring accuracy
In order to accurately distinguish different slurry environments, the power parameters of the motor drive blades are detected while detecting the slurry electrical impedance, that is, water, mud, concrete and concrete mud are distinguished by judging the rotor speed in different slurry environments; to ensure accurate judgment of the speed, the equipment simultaneously detects the drive motor current and rotor pulse to ensure that the rotor speed can be accurately judged in a high-density slurry environment.
(2) Integrated portable design, easy to use on site, more convenient to operate
The equipment host, cable reel, and sound and light alarm are integrated into one, which is easy to carry and can also provide timely warnings to the construction site. The product only needs to calibrate the poured concrete and mud in advance to directly monitor the pouring process. The operation is simple and can adapt to different formulas of mud and concrete.
(3) Data statistics + visual simulation analysis, the system platform statistical analysis is more comprehensive
The monitoring data can be uploaded to the cloud platform for data recording, analysis, and visual display. Management personnel can grasp the pouring monitoring process through mobile phones or PCs.
Working voltage | DC12V |
Working current | <1A |
Working temperature | -10ºC~+60ºC |
Working time | >4 hours (built-in lithium battery does not require external power supply, and can also be powered externally through a power adapter) |
Detection depth | standard 30 meters (customizable) |
Control method | panel button control |
Result output | automatic sound and light alarm |
Dimensions | 48mmx71mmx482mm (probe) 350mmx214mmx440mm (main control wire rack) |
Mass | 2.5KG (probe) 6KG (main control wire rack) |
Chongqing Gold Mechanical & Electrical Equipment Co., Ltd is specialized in manufacturing and developing of Geophysical Exploration Instrument such as Resistivity Meter, IP Instrument, Resistivity Image, Seismic Instrument, Electromagnetic Instrument, Borehole Camera, Borehole Logging System, Water Level Meter; Borehole Drilling Equipment including Core/ Water Well/ Tunnel/ Engineering/ Anchor Drilling Rigs&Accessory and Geodetic Surveying Instrument(GNSS RTK System, Total Station, GIS Mapping and Echo Sounder).