Piling Concrete Monitor Pile Cap Concrete Recorder Cast-in-place Piles Overcast Control System
The Piling Concrete Monitor Pile Cap Concrete Recorder Cast-in-place Piles Overcast Control System can intelligently detect the pouring state of the concrete through the sensor, and judge whether the concrete has reached the design elevation. When the concrete is poured to a position close to the elevation, the instrument will automatically give an early warning, prompting to slow down the pouring speed; when pouring continues to the position corresponding to the elevation, the instrument will alarm and stop pouring.
This device solves the problem of overcast or underfilling caused by experience in the traditional manual operation process, improves the qualification rate of concrete cast-in-place piles, and reduces the waste of concrete resources. At the same time, environmental pollution caused by discarded concrete blocks is reduced, which can effectively ensure construction quality and improve construction efficiency. This equipment is generally suitable for pouring concrete piles of various projects, including dry hole and underwater concrete piles.
Advantages of Piling Concrete Monitor Pile Cap Concrete Recorder Cast-in-place Piles Overcast Control System
Intelligent control · Sound and light warning
After the probe is installed and lowered, there is no need for manual operation during the whole process, and the instrument automatically collects; the concrete is poured close to the test surface, the instrument automatically warns, and the yellow light indicator flashes to remind you to slow down the pouring speed; the concrete reaches the test surface, the instrument automatically alarms, and the green indicator is always on light.
Well-designed and adaptable
1. Taking into account the impact of the harsh environment on the construction site, the winch and the equipment box are designed with isolation, and the dry and wet partitions are used to facilitate the recovery and washing of the probe cables on site.
2. Unique grooves structure, the cable tie can be installed directly, and can be easily pulled out after the test is completed.
3. The probe is made of alloy material, and the cable has a built-in Kevlar cable, which can withstand a pulling force of 100kg.